HOA Karen Fined Me Over My Propane Tank — Then I Shut Down the Entire Subdivision

HOA Karen Fined Me Over My Propane Tank — Then I Shut Down the Entire Subdivision

Chapter 7

Theme:
Font Size:
24px

So does property law, apparently.

When I returned to my truck, Monica stood beside the driver’s door.

Mud had covered the lower half of her shoes.

“You need to think carefully.”

She said.

“I am.”

“You are putting sewer service for more than a hundred homes at risk.”

“The pump station is not operating.”

“That is because you keep delaying construction.”

“No.”

“It is because the county inspector looked at the station and asked why it was here.”

Her hand tightened around the portfolio.

“Do you really want homeowners receiving delay notices because you refused to cooperate?”

There it was.

First authority.

Then money.

Now guilt.

“Send me that in writing.”

She stared.

“What?”

“Write that you intend to blame me for delays while you still have not identified the right to use my land.”

She did not answer.

By 1:20, Rick received a phone call.

He walked away from the crew.

Talked for ten minutes.

Returned.

“Shut it down.”

The operators looked at him.

Monica moved immediately.

“What happened?”

“My risk manager wants site control confirmed before we extend the trench.”

“This is ridiculous.”

“No.”

“This is insurance.”

“The engineer approved the location.”

“Engineering and ownership are not the same file.”

That sentence mattered.

Monica lowered her voice.

“You are letting a landowner derail a public-safety project.”

Rick looked toward me.

Then the trench.

“I’m keeping my company out of a title dispute.”

Machines shut off.

The sudden quiet was remarkable.

Survey crew packed.

Laborers secured pipe.

Monica stood beside the concrete pad without anyone taking instructions from her.

I sat in my truck and wrote everything down.

Work authorization lacking parcel description.

Contractor requested site-control attachment.

Two survey stakes.

Approved station sheet reference.

County inspector questioning location.

$1,200/day threat.

Livestock incident.

Crew shut down pending property verification.

At that point I still did not know where the pump station legally belonged.

But Monica was no longer the only person claiming to know.

The next morning, I drove to County Development Services.

I did not ask:

“Is the HOA trespassing?”

Clerks are not judges.

I asked for records.

Project number.

Approved plans.

Revisions.

Inspection notes.

Engineer correspondence.

Change requests.

Site-control documents submitted with the project.

The clerk, Amy Serrano, found the electronic file.

It was larger than I expected.

Wastewater projects generate paper.

Plans.

Calculations.

Electrical specifications.

Hydraulic profiles.

Geotechnical work.

Construction notes.

Revision sets.

Permit comments.

Contractor RFIs.

I began with the phrase I had heard.

Approved station sheet.

Amy opened the stamped civil set.

There it was.

Pump Station PS-2.

Clearly labeled.

Equipment pad.

Force main.

Electrical feed.

Access path.

Elevation.

County approval stamp.

Then I looked at property boundaries.

The station sat entirely inside:

REDSTONE CREST HOA COMMON PARCEL B.

News in the same category

HOA Karen Fined Me Over My Propane Tank — Then I Shut Down the Entire Subdivision

20 Part